Deprecated: preg_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in /home/bt3k7ogr95sw/public_html/wp-includes/formatting.php on line 868

Professional Builders & Post-Construction Cleaning

  • Home
  • Services
  • Professional Builders & Post-Construction Cleaning
Team removing protective tape and cleaning a newly built kitchen

Turn your construction site into a move-in ready home. We specialize in removing building dust, paint splashes, and cement residue. Trusted by Melbourne builders and developers for defect-free handovers.

Building dust (silica) gets everywhere. It settles on top of doors, inside cupboards, and on window tracks. Standard cleaning equipment simply can’t handle it. Shine Group holds the solution. Our specialized “Builders Clean” team comes equipped with industrial HEPA vacuums, scrapers, and the expertise to safely remove paint and render from glass. We carry White Cards, provide SWMS, and understand tight deadlines. We are the final bridge between construction and completion.

The 3-Stage Process

Our Construction Cleaning Stages

Phase 1

The Rough Clean (Initial)

  • Action: Removal of large debris, stickers, and packaging. Thorough vacuuming to remove bulk dust.
  • Timing: Before caulking/silicone or carpet laying.
Phase 1
Phase 2

The Final Detail (The Big One)

  • Action: Deep cleaning of all surfaces. Scraping paint off windows, cleaning inside cupboards, acid wash of tiled floors (if needed), polishing fixtures.
  • Timing: Before client walkthrough / handover.
Phase 2
Phase 3

The Touch-Up (Defect Clean)

  • Action: Quick wipe down of any dust settled after trades return for defects.
  • Timing: Just before the owners get the keys.
Phase 3

Why Melbourne Businesses Trust Us?

Local Testimonials

FAQ Builders & Post-Construction Cleaning

Do your staff have White Cards?

Yes, all team members attending construction sites hold valid Construction Induction (White) Cards.

Do you provide SWMS?

Yes, we provide site-specific Safe Work Method Statements before commencing work.

How much notice do you need?

We know construction dates change. We try to be flexible, but 48 hours’ notice is appreciated.

Can you remove paint from carpets?

We can treat small paint spots. Large spills might require carpet replacement, but we do our best with specialized solvents.

Do you clean the windows outside?

Yes, we clean external windows and frames. For double-storey homes, we use ladders or poles.


Full Name
Phone
Date
Email
Select Services
Office Cleaning Melbourne
Medical Centre Cleaning
Strata & Body Corporate Cleaning
Warehouse & Industrial Cleaning
Retail & Showroom Cleaning
Builders & Post-Construction Cleaning

Request a Quote


Full Name
Email
Phone
Postal Code
Select Services
Requirements